DUBAI (The Thursday Times) — Dubai’s Roads and Transport Authority (RTA) has opened three bridges and two loop ramps at the junction of Al Qudra Road and Sheikh Zayed bin Hamdan Al Nahyan Street, completing all bridge works under the Al Qudra Road Key Intersections Development Project, the authority said on Sunday.
The structures span a combined 2,660 metres and let motorists cross the junction without stopping at signals in any direction. The RTA says this cuts travel time by up to seven minutes and lifts the junction’s capacity by 150 per cent, from 7,800 to 19,400 vehicles an hour.
What has opened
The first bridge is 750 metres long with two lanes and carries traffic from Al Qudra Road towards Jebel Ali along Sheikh Zayed bin Hamdan Al Nahyan Street. The second, 900 metres long with two lanes, serves drivers heading for the city centre and Dubai International Airport. The third, a single-lane bridge of 500 metres, links nearby residential areas to Al Qudra City.
Two two-lane loop ramps complete the set. One, 230 metres long, takes traffic from Sheikh Zayed bin Hamdan Al Nahyan Street towards Al Qudra City, and the other, 280 metres long, serves traffic heading for Umm Suqeim. The project also includes three kilometres of service roads on both sides of the street.
The wider project
The opening follows two main bridges at the same junction, which span 1,400 metres and carry eight lanes in both directions. Across the whole project, the RTA counts bridges totalling 4,750 metres and improvements to 11.6 kilometres of Al Qudra Road. It expects the road’s capacity to rise by 33 per cent, from 12,000 to 16,000 vehicles an hour in both directions, and journey times to fall by 70 per cent, from 10 minutes to three.
The road serves more than 400,000 residents and visitors in communities that include Arabian Ranches, Dubai Motor City, Dubai Studio City, Akoya, Mudon, DAMAC Hills, The Sustainable City, and Town Square. It links Sheikh Mohammed bin Zayed Road, Sheikh Zayed bin Hamdan Al Nahyan Street, and Emirates Road.
Mattar Al Tayer, the RTA’s director general and chairman of its board of executive directors, said the project was part of efforts to keep Dubai’s road network in step with the emirate’s growth. “Road network development projects are of strategic importance in supporting Dubai’s urban and economic growth by providing advanced infrastructure capable of accommodating future expansion and enhancing the attractiveness of residential, development and investment areas,” he said.



